Office Building

Challenge

Employees in this office building were uncomfortable from over heating and over cooling from an aging multi-zone system and poorly operating pneumatic controls.

The customer wanted Perfection to help control tenant comfort with an energy-efficient solution.

Solution
Throughout the installation process, Perfection provided temporary cooling storage when necessary to prevent product loss. A preventative maintenance program was established to reduce service calls and component failures on all HVAC/R systems. The Perfection team provided a 24/7 response time of less than two hours for all stores in the service coverage area

Results
Perfection’s solution helped reduce energy costs, repair costs and total service calls. Product loss was reduced to below 5% for the region. The projects were completed on time despite tight deadlines, and counter sales were not affected by installation.